REALIZED PROJECTS

(FROM 2011 TO THE PRESENT TIME)

.
SUBJECT OF CONTRACT PROJECT (CUSTOMER) Capacity,
MW
Desig-
ning
stage
Year
of
Exec.
RUSSIA Nuclear power plants
Unit pump house Novovoronyezh NPP-2 2400 DD 2011-
2012
Heat distribution point Novovoronyezh NPP-2 2400 DD 2011-
2012
Building of common station switchgear Novovoronyezh NPP-2 2400 DD 2011-
2012
Make-up plant for heat supply system Novovoronyezh NPP-2 2400 DD 2011-
2012
Designing of glass-reinforced plastic pipelines in the systems of main cooling water blow down and make-up Novovoronyezh NPP-2 2400 DD 2011-
2012
Connection to the switch gear network Novovoronyezh NPP-2 2400 DD 2011-
2012
Chamber for erection of non-return valves of circulation water ducts Novovoronyezh NPP-2 2400 DD 2011-
2012
Cold water discharge channel for cooling tower with ajoint structures and cooling water intake on the discharge channel of the cooling tower Novovoronyezh NPP-2 2400 DD 2011-
2012
Correction of the DD for trestles connecting the main plant buildings and ancillary buildings and facilities Novovoronyezh NPP-2 2400 DD 2011-
2012
Pipelines for flushing of plant site main cooling water preliminary treatment filters Novovoronyezh NPP-2 2400 DD 2011-
2012
Rendering of site supervision services Novovoronyezh NPP-2 2400 DD 2011-
2012
Title temporary buildings and structures. Structures of construction base. General contractor’s workshops Baltiñ NPP 2300 DD 2012
Prolongation of the operation period of power generating unit No.2.  Nitrogen cum oxygen station (replacement of equipment) Smolensk NPP 3000 DD 2012
Renovation of drain cum refilling trestle for liquid chemical elements Smolensk NPP 3000 DD 2012
Provision of water chemistry mode of main cooling water and organization of its discharge from nuclear power plant site Smolensk NPP-2 2510 BP 2015
Cooling water system of important consumers Smolensk NPP-2 2510 BP 2015
Treatment of water reservoir from silt sediments Kursk NPP 4000 DD 2014
Reconstruction of level of cooling water reservoir Kursk NPP 4000 DD 2014
Mounting of hydraulic seal Kursk NPP 4000 DD 2014
Development of detailed documentation for external power supply for the facilities of the radioactive waste processing complex (KP RAO) of the Kursk NPP Kursk NPP 4000 DD 2016-2017
Development of basic design and detailed documentation for external power supply for the facilities of the radioactive waste processing complex (KP RAO) of the Kursk NPP in term of connection of transformer equipment to the Substation 330 / 10kV "Stroybaza" Kursk NPP 4000

BP,DD

2017-2018
RUSSIA Utility engineering
Ecologically conscious  cluster for recycling of domestic and industrial wastes Rostov region 600 thousand/ t per year

BP
DD

2012-
2013
RUSSIA Thermal stations
Emergency diesel oil facilities for power generating unit of combined cycle plant - 420 No. 9 Serov TPP 420 DD 2011-
2012
Gaseous fuel facilities for power generating unit of combined cycle plant - 420 No. 9 Serov TPP 420 DD 2011-
2012
Approach railway to the emergency diesel oil facilities for power generating units of combined cycle plant - 420 area Serov TPP 420 DD 2011-
2012
Construction of power generating unit ¹8 for combined cycle plant - 420Ò. Emergency diesel oil facilities Heat Electropower
Station -16
(city of Moscow)
420 DD 2012-
2013
Detailed documentation for the fire extinguishing, water supply and sewerage systems for the project: "The main production complex. In-site facilities (1-st stage)» Sakhalin SRPP-2 120 DD 2018
RUSSIA Projects of oil industry
Reconstruction of Kozulka petroleum storage depot of JSC “Gazpromneft - Terminal” Kozulka petroleum storage depot, Krasnoyarskiy kray 260000 t/year

BP
DD

2014- 2015
IRAN Nuclear power plants
Basic design for the seawater treatment structure. Technical water supply system BUSHEHR-2 NPP 2000 BP 2016-
2018
BANGLADESH Nuclear power plants
Complex of facilities of construction and erection base Ruppur NPP 2000

BP
DD

2015
FINLAND Nuclear power plants
Chilling machine building USJ with engineering systems, cold supply complexes and process systems within the limits of building USJ HANHIKIVI NPP-1 1200 BP 2015
TURKEY Nuclear power plants
Development of detailed documentation for civil structures for: the reactor compartment 10UGA, the supplementary control room of power unit 10UCB, the cable tunnels 11-18 UBZ, 11-12 UPZ, 11-12 UKZ, 11-12 USZ, the process tunnels 13-14 UQZ, 11-13UJZ, the ventilation centers of cable tunnels 11-17 UUB, 11-12 UKZ, 11-12 UUK, 18-19UUB AKKUYU NPP 5000 DD 2017-2019
INDIA Nuclear power plants
Development of detailed documentation for civil structures of the USY trestle for power units No. 3 and No. 4 KUDANKULAM NPP 2000 DD 2017-2019
Development of detailed documentation for process pipelines of UMA, UBA, UQA buildings and development of documentation for ventilation and cooling systems for UAZ tunnels, including UUA ventilation centers and revision of detailed documentation for the process pipelines of UMA building for power units No. 3 and No.4 KUDANKULAM NPP 2000 DD 2018-2019