SUBJECT OF CONTRACT |
PROJECT (CUSTOMER) |
Capacity,
MW |
Desig-
ning
stage |
Year
of
Exec. |
RUSSIA Nuclear power plants |
Unit pump house |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Heat distribution point |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Building of common station switchgear |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Make-up plant for heat supply system |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Designing of glass-reinforced plastic pipelines in the systems of main cooling water blow down and make-up |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Connection to the switch gear network |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Chamber for erection of non-return valves of circulation water ducts |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Cold water discharge channel for cooling tower with ajoint structures and cooling water intake on the discharge channel of the cooling tower |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Correction of the DD for trestles connecting the main plant buildings and ancillary buildings and facilities |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Pipelines for flushing of plant site main cooling water preliminary treatment filters |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Rendering of site supervision services |
Novovoronyezh NPP-2 |
2400 |
DD |
2011-
2012 |
Title temporary buildings and structures. Structures of construction base. General contractor’s workshops |
Baltiñ NPP |
2300 |
DD |
2012 |
Prolongation of the operation period of power generating unit No.2. Nitrogen cum oxygen station (replacement of equipment) |
Smolensk NPP |
3000 |
DD |
2012 |
Renovation of drain cum refilling trestle for liquid chemical elements |
Smolensk NPP |
3000 |
DD |
2012 |
Provision of water chemistry mode of main cooling water and organization of its discharge from nuclear power plant site |
Smolensk NPP-2 |
2510 |
BP |
2015 |
Cooling water system of important consumers |
Smolensk NPP-2 |
2510 |
BP |
2015 |
Treatment of water reservoir from silt sediments |
Kursk NPP |
4000 |
DD |
2014 |
Reconstruction of level of cooling water reservoir |
Kursk NPP |
4000 |
DD |
2014 |
Mounting of hydraulic seal |
Kursk NPP |
4000 |
DD |
2014 |
Development of detailed documentation for external power supply for the facilities of the radioactive waste processing complex (KP RAO) of the Kursk NPP |
Kursk NPP |
4000 |
DD |
2016-2017 |
Development of basic design and detailed documentation for external power supply for the facilities of the radioactive waste processing complex (KP RAO) of the Kursk NPP in term of connection of transformer equipment to the Substation 330 / 10kV "Stroybaza" |
Kursk NPP |
4000 |
BP,DD |
2017-2018 |
RUSSIA Utility engineering |
Ecologically conscious cluster for recycling of domestic and industrial wastes |
Rostov region |
600 thousand/ t per year |
BP DD |
2012-
2013 |
RUSSIA Thermal stations |
Emergency diesel oil facilities for power generating unit of combined cycle plant - 420 No. 9 |
Serov TPP |
420 |
DD |
2011-
2012 |
Gaseous fuel facilities for power generating unit of combined cycle plant - 420 No. 9 |
Serov TPP |
420 |
DD |
2011-
2012 |
Approach railway to the emergency diesel oil facilities for power generating units of combined cycle plant - 420 area |
Serov TPP |
420 |
DD |
2011-
2012 |
Construction of power generating unit ¹8 for combined cycle plant - 420Ò. Emergency diesel oil facilities |
Heat Electropower Station -16 (city of Moscow) |
420 |
DD |
2012-
2013 |
Detailed documentation for the fire extinguishing, water supply and sewerage systems for the project: "The main production complex. In-site facilities (1-st stage)» |
Sakhalin SRPP-2 |
120 |
DD |
2018 |
RUSSIA Projects of oil industry |
Reconstruction of Kozulka petroleum storage depot of JSC “Gazpromneft - Terminal” |
Kozulka petroleum storage depot,
Krasnoyarskiy kray
|
260000 t/year |
BP DD |
2014-
2015 |
IRAN Nuclear power plants |
Basic design for the seawater treatment structure. Technical water supply system |
BUSHEHR-2 NPP |
2000 |
BP |
2016-
2018 |
BANGLADESH Nuclear power plants |
Complex of facilities of construction and erection base |
Ruppur NPP |
2000 |
BP DD |
2015 |
FINLAND Nuclear power plants |
Chilling machine building USJ with engineering systems, cold supply complexes and process systems within the limits of building USJ |
HANHIKIVI NPP-1 |
1200 |
BP |
2015 |
TURKEY Nuclear power plants |
Development of detailed documentation for civil structures for: the reactor compartment 10UGA, the supplementary control room of power unit 10UCB, the cable tunnels 11-18 UBZ, 11-12 UPZ, 11-12 UKZ, 11-12 USZ, the process tunnels 13-14 UQZ, 11-13UJZ, the ventilation centers of cable tunnels 11-17 UUB, 11-12 UKZ, 11-12 UUK, 18-19UUB |
AKKUYU NPP |
5000 |
DD |
2017-2019 |
.
INDIA Nuclear power plants |
Development of detailed documentation for civil structures of the USY trestle for power units No. 3 and No. 4 |
KUDANKULAM NPP |
2000 |
DD |
2017-2019 |
Development of detailed documentation for process pipelines of UMA, UBA, UQA buildings and development of documentation for ventilation and cooling systems for UAZ tunnels, including UUA ventilation centers and revision of detailed documentation for the process pipelines of UMA building for power units No. 3 and No.4 |
KUDANKULAM NPP |
2000 |
DD |
2018-2019 |